Transformer Water Spray Protection
Main transformer water-spray (GB50219-95): protection area, nozzle selection q=K(10P)^0.5 and actual spray-intensity verification.
S1 · 2·L·H
—
m²
S2 · 2·W·H
—
m²
S3 · L·W
—
m²
S4 · pillow
—
m²
S5 · pit
—
m²
S6 · body total
—
m²
S7 · pit−S3
—
m²
1. Nozzle flow q
—
L/min
1. Nozzles n
—
pcs
2. Nozzle flow q
—
L/min
2. Nozzles n
—
pcs
3. Nozzle flow q
—
L/min
3. Nozzles n
—
pcs
4. Nozzle flow q
—
L/min
4. Nozzles n
—
pcs
5. Nozzle flow q
—
L/min
5. Nozzles n
—
pcs
1. Oil pillow · req ≥ W2
—
L/min·m²
2. Body top · req ≥ W2
—
L/min·m²
3. Body long · req ≥ W2
—
L/min·m²
4. Body short · req ≥ W2
—
L/min·m²
5. Oil pit · req ≥ W1
—
L/min·m²
Node pressure C = C0 + Σh of the previous segment; nozzle flow F = E·(10C/100)^0.5; segment flow G = previous G + F; velocity V = 400·G/(6·π·I²); gradient i = 0.00107·V²/(I/1000)^1.3; loss = 1.2·D·i; running total N = 1.2·D·i + prev N + Δh.
| Node | Segment | Node pressure C | Segment length D (m) | Nozzle coeff E | Nozzle flow F | Segment flow G | Design dia H (mm) | Calc dia I (mm) | Velocity V (m/s) | Gradient i | Loss (m) | Δh (m) | Σh (m) |
|---|
Areas: S1 = 2·L·H, S2 = 2·W·H, S3 = L·W, S4 = π·d·l/2 + π·d²/2, S5 = pit length·width, S6 = S1+S2+S3+S4, S7 = S5−S3. Nozzle q = K·(10P)^0.5 (L/min); quantity n = S·W/q; verified Wj = Q/S. Covers GB50219-95 requirements.