Pipe Trench Excavation Earthwork

Trench excavation volume = average cross-section area × pipe length, for rainwater and sewage pipe layouts (pipe trench excavation).

Manhole Road level B Road thick Pipe invert C Pipe dia D (mm) Increment E Base width G Slope H Excav. depth F Cross area I Pipe length K (m) Avg cross area J Earthwork L (m³)
Total trench earthwork ΣL

Excavation depth F = road level − road thickness − pipe invert + increment. Cross area I = (base width G + F·slope)·F. Average area J = (Iₘ + Iₘ₊₁)/2 between consecutive manholes; earthwork L = J·K (pipe length). Road thickness defaults to 0.7 m for rainwater and 0.7/0.75 for sewage and can be adjusted per row. Total = ΣL.